Sinopec Fuling Shale Gas Field Sets New Cumulative Production Record of 40 Billion Cubic Meters

BEIJING, Oct. 9, 2021 /PRNewswire/ — China Petroleum & Chemical Corporation’s (HKG: 0386, “Sinopec”) Fuling Shale Gas Field – the first commercially developed and operated large-scale shale gas field in China – announced on October 8 that it has produced 40 billion cubic meters of shale gas, setting a new record for the cumulative production of shale gas in the country. The steady supply of a green gas source has benefited more than 200 million residents in over 70 cities across six provinces along the Yangtze River Economic Belt.

Sinopec Fuling Shale Gas Field Sets New Cumulative Production Record of 40 Billion Cubic Meters.

Shale gas is an unconventional natural gas that exists in the organic-rich mud shale and its interlayers in an adsorbed or free state. The main component of shale gas is methane, a clean, efficient energy resource and industrial chemical, widely used in residential gas, urban heat supply, power generation, automobile fuel and chemical production.

Sinopec’s Fuling Shale Gas Field has a daily gas production reaching 20 million cubic meters at present and can meet the gas demands of 40 million households, contributing to a speedy clean energy transition, ensuring national energy security and helping to achieve the goals of reaching peak carbon and carbon neutrality.

The Fuling Shale Gas Field is located in the Fuling District of Chongqing City and is one of the key gas sources of China’s Sichuan-East Gas Pipeline and a foundation of Sinopec’s promotion of gas popularization in the Yangtze River Economic Belt. The construction of the gas field began in December 2012 and at the time it was the world’s first major commercial shale gas discovery outside North America. The project entered commercial development ahead of schedule in March 2014 and became China’s first large-scale shale gas field with commercial development. It also made China the third country worldwide to achieve shale gas commercial development after the United States and Canada.

The gas field went into operation in 2017 as scheduled with an annual production capacity of 10 billion cubic meters, reducing carbon dioxide emissions by 12 million tons per year, which is the equivalent of planting 110 million trees or taking 8 million cars off the roads. The successful development of the Fuling Shale Gas Field has set a new milestone in China’s energy development history and opened a new chapter for the country’s energy revolution.

Innovative management model enabling “Chinese speed” for shale gas development

Sinopec Jianghan Oilfield Company benchmarked world-class standards to optimize production organization and operation as well as standardized construction, significantly accelerating and improving productivity and construction of the gas field to build a shale gas production capacity of 10 billion cubic meters in only three years. It became China’s first large-scale shale gas field to reach 10 billion cubic meters, enabling the “Chinese speed” that has turned heads around the world.

Now, the construction period of drilling and fracturing has been cut in half. The Jiaoye 1HF discovery well of the gas field has been in continuous production for more than 3,000 days. Another well, the Jiaoye 6-2HF, has produced more than 330 million cubic meters of gas as it maintains two records for the longest development time of domestic shale gas wells and highest single well cumulative production.

According to an assessment by China’s Ministry of Natural Resources in October 2020, the proven total reserves of the shale gas field in Fuling have reached 792.641 billion cubic meters.

Starting from scratch, Sinopec has been continuously exploring, fracturing, and has integrated five technology systems of shale gas development including the staged fracturing gas testing of long horizontal wells and green development, laying a solid theoretical and technical foundation for China’s large-scale shale gas exploration and development.

In November 2014, Sinopec was granted the “International Pioneer Award” by the 5th World Shale Oil & Gas Summit for the discovery of Fuling Shale Gas Field. In 2018, the “Efficient Exploration and Development of Fuling Large-scale Marine Shale Gas Field” project won the first prize in the National Science and Technology Progress Awards.

For more information, please visit Sinopec.

Logo

Photo – https://mma.prnewswire.com/media/1656397/image.jpg

Logo – https://mma.prnewswire.com/media/960416/SINOPEC_Logo.jpg

ITR, Schaeffler and MAHLE unveil DTM Electric Design Model at Norisring

  • Next step towards fully electric race series
  • DTM Electric Design Model shows what the race cars will look like
  • Outlook on prototype that is currently being developed

NUREMBERG, Germany, Oct. 9, 2021 /PRNewswire/ — The future of electrified motorsport is looking good! During DTM Norisring powered by BWT, ITR GmbH and series’ partners Schaeffler and MAHLE presented the next step towards DTM Electric. Prior to the first race of the DTM season finale, DTM boss Gerhard Berger, Matthias Zink (CEO Automotive Technologies, Schaeffler), Dr. Jochen Schroeder (President E-Mobility Division, Schaeffler) and Fred Tuerk (Vice President MAHLE Motorsport) unveiled the DTM Electric Design Model.

The DTM Electric Design Model is a 1:1 model of the prototype for the race series that is currently being developed and shows the look of the DTM Electric cars. Participants in DTM Electric will have the possibility to adapt the chassis with their specific design characteristics.

This is the next big step after the presentation of the DTM Electric Demo Car that demonstrated the technical basis of the futuristic race series. Over 1,000 horsepower and top speeds of well over 300 km/h will provide an electrifying motorsport experience in future as DTM Electric shows sustainable racing at highest level with help from strong partners like DTM Electric pioneer Schaeffler and MAHLE.

The DTM Electric cars will feature single-wheel electric drives from Schaeffler, featuring an infinitely variable torque distribution and therefore reaching into new dimensions both in driving dynamics potential as well as for recuperable energy. Moreover, all DTM Electric cars will come with the innovative Space Drive steering system that is already successfully used in DTM. As a result, DTM Electric as an innovation laboratory in motorsport will provide an ideal mix of attractive racing and future technology.

– Cross reference: Picture is available at AP Images (http://www.apimages.com)

The Arab League welcomes the signing of the Joint Military Committee 5 + 5 in Geneva on an action plan to remove mercenaries and foreign forces from Libya.

Cairo, The Arab League welcomed the signing of the Joint Military Committee 5 + 5 in Geneva on an action plan to remove all mercenaries and foreign forces from Libyan territory gradually, balanced and simultaneously under the auspices of the United Nations.

In a statement, the university praised the efforts of the Joint Military Committee to consolidate the ceasefire agreement since its signing last October, and its keenness to implement all its provisions, due to its positive impact on continuing the ongoing political process and holding presidential and legislative elections in normal conditions.

The League of Arab States called on all international and regional partners to cooperate and provide support for the implementation of this plan, and the rest of the benefits related to the ceasefire agreement, foremost of which is the unification of the military institution.

Source: Libyan News Agency

The Italian Eni Company: The company’s branch in Libya was not affected by any damage during the years of the conflict.

Rome, The director of public relations for the Italian group Eni “Labo Pestelli” confirmed that the company’s branch in Libya had not been affected by any damage during the past ten years, attributing the reason for this to the strong connection with the population and local authorities in the country.

In his speech on the occasion of the opening of the tenth edition of the Conference on Shared Awareness and Conflict Resolution in the Mediterranean, organized by the Maritime Operation Irini, Pisteli said that the instability in Libya causes difficulties, which he described as simple, related to maintenance problems, hoping to raise the country’s gas production, which could reach three times.

He added that although the Mediterranean region represents 1% of the sea area in the world; But it affects 20% of trade, because the region enjoys a geopolitical position between Europe and Africa.

Pestelli pointed out that there is a wide scope for cooperation in Africa at this stage in which Europe is focusing on the energy transition, as he described it, noting the possibility of cooperation between the two shores of the Mediterranean.

Source: Libyan News Agency

Libyan Airlines resumes flights to Cairo International Airport.

Tripoli, The Libyan Airlines Company announced today, Saturday, the resumption of flights to Cairo International Airport, after a seven-year hiatus.

The company, on its Facebook page, published photos of the flight crew during the first flight from Maitiga International Airport.

The Al-Ahram Gate website stated that the first flights are scheduled to take off from Maitiga International Airport at 11.30 am this morning, when they will arrive at Terminal No. 1 known as the old airport at Cairo International Airport.

And the website quoted sources at Cairo Airport: “Cairo International Airport received a letter from Libyan Airlines confirming the arrival of the flight today, Saturday.”

He explained that the plane is an Airbus (330) and carries flight number (LN 202) with 255 passengers on board, indicating that it will leave Cairo immediately after landing and return with 250 passengers on board.

The site indicated that the Libyan Airlines asked Cairo International Airport to prepare a celebration for the arrival of the first flight, through water cannons that receive the plane on the airport runway, which is the customary procedure for the opening of new airlines or the resumption of flights after a long pause.

Source: Libyan News Agency

MP Moussa Al-Koni discusses the illegal immigration file with the Prime Minister of the National Unity Government.

Tripoli, The Representative of the Presidential Council, Musa Al-Koni, discussed with the Prime Minister of the Government of National Unity, “Abdul Hamid Al-Dbaiba,” today, Saturday, the file of illegal immigration, and the conditions of migrants, in the presence of the Minister of Interior, Major General Khaled Mazen, who reviewed before them the measures taken by the government against the background of recent events, related to illegal immigrants.

The deputy and the Prime Minister stressed, during the meeting, which was held at the Cabinet Office, the need to announce the details of the incident, and the measures taken by the ministry in front of local and international public opinion, so that the picture is clear to prevent the interpretation of facts with the aim of media fanning and misleading public opinion.

Source: Libyan News Agency